09 September 2008

2nd vertical drop ?

Looking at the pictures today it looks like a vertical drop track lying on the station base.
The plan shows that the track drops down at the same angle as the trench. The ride will leave the loading area, then turn right and suddenly drops (a more than vertical drop), approx 10 meters I guess, down into the trench in the ground. I believe this is their plan. (now confirmed)

1 comment: